Selected Work

Repair projects — what we've delivered.

A snapshot of recent work across engine, pipework, valves, gearbox, rudder and naval sea-fastening projects nationwide.

LNG Tanker

Cargo Line Replacement — M.T. Kinna

Fleet Services was the preferred repair contractor for the damaged LNG tanker M.T. Kinna. Four major cargo lines were replaced in full, in location, whilst the vessel was loaded with cargo. All repairs were done at the anchorage in a timely, efficient and safe manner.

View case study
Heavy Lift

Sea Fastening of a Drill Rig

This project was completed over a 2 day period to fasten the semi-submersible drilling rig to the deck of the heavy lift ship for a voyage to Singapore for repairs. All shore services available for comprehensive rig lay ups and preparations for major projects.

View case study
Crane

Crane Repairs

Fleet Services was chosen as the preferred workshop to remove a damaged cargo crane following an accident in port. The crane was disassembled, landed and stored for further examination. As detailed in the photos the slew bearing was split to confirm the extent of damage.

View case study
Electrical

Circuit Breaker

Fleet Services was called upon to assess and re-instate circuit breakers to the main switchboard of a vessel that had experienced a blackout after a major fault.

View case study
Gearbox

Gearbox Repair

During a scheduled layup of a container vessel, Fleet Services was required to remove the main engine gearbox for assessment and repair via an opening into the cargo hold. All work completed within time and budget.

View case study
Rudder

Rudder Repair

Fleet Services was called upon at short notice to investigate cracks to a rudder and resolve outstanding issues. This involved locating the source of cracks and then repair to GL Class requirements; approved weld procedures were used for plate inserts and repairs to the rudder's casting.

View case study
Naval

Sea Fastening Removal — HMAS Canberra

Sole contractor engaged to ensure a safe and efficient float-off for the Royal Australian Navy's HMAS Canberra hull. Removed all sea fastenings and the dynamic cradle, preparing the hull for transportation to Geelong.

View case study
Featured case study · LNG Tanker

M.T. Kinna — cargo line replacement.

Fleet Services was the preferred repair contractor for the damaged LNG tanker M.T. Kinna. Four major cargo lines were replaced in full, in location, whilst the vessel was loaded with cargo.

M.T. Kinna
Cargo lines
Crane lifting
Cargo pipework
Workshop fabrication
M.T. Kinna at anchorage
Featured case study · Heavy Lift

Sea fastening of a drill rig.

This project was completed over a 2 day period to fasten the semi-submersible drilling rig to the deck of the heavy lift ship for a voyage to Singapore for repairs.

Sea-fastening welds
Drilling rig loaded
Featured case study · Crane

Crane repairs.

Fleet Services was chosen as the preferred workshop to remove a damaged cargo crane following an accident in port. The crane was disassembled, landed and stored for further examination.

Damaged crane
Crane column lifted
Riggers at height
Crane jib section
Featured case study · Electrical

Circuit breaker re-instatement.

Fleet Services was called upon to assess and re-instate circuit breakers to the main switchboard of a vessel that had experienced a blackout after a major fault.

Circuit breakers
Damaged contacts
Reinstated breakers
Newly fitted breakers
Featured case study · Gearbox

Main engine gearbox repair.

During a scheduled layup of a container vessel, Fleet Services was required to remove the main engine gearbox for assessment and repair via an opening into the cargo hold. All work completed within time and budget.

Opening cut
Chain blocks rigged
Gearbox lowered
Featured case study · Rudder

Rudder repair to GL Class.

Fleet Services was called upon at short notice to investigate cracks to a rudder and resolve outstanding issues. Approved weld procedures were used for plate inserts and repairs to the rudder's casting.

Inspecting cracks
Plate insert welded
Rudder repair access
Completed weld repair
Featured case study · Naval

Sea fastening removal — HMAS Canberra.

Fleet Services was the sole contractor engaged to remove all sea fastenings and dynamic cradle structures to ensure the safe and efficient float-off of the Royal Australian Navy's HMAS Canberra hull.

Sea-fastening strut
Dynamic cradle
Working beneath hull
Timber-packed cradle
Have a project in mind?

From emergency callouts to scheduled overhauls — we'll deliver on time and to Class.